home d.tech life Correction to “Hard Hat Report: Update on Oracle Campus”

Correction to “Hard Hat Report: Update on Oracle Campus”

By Dragon Staff

In the inaugural print issue of the newspaper (May 25, 2017), the lead story, “Hard Hat Report: Update on Oracle Campus”, by Bibi Wong, incorrectly reported Mitch McDonald title as Chief Architect. His actual title is Senior Superintendent with XL Construction. The cost of the building was also misrepresented. The cost of the building was reported as $32 million, but the total cost is actually more than $43 million, as it includes permitting and other costs. And finally, the story misstated that every teacher would have an office. In actuality, each classroom neighborhood includes a shared breakout room for private mtgs with students and group collaboration.

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *